In the newly constructed part of the building, work spaces are located around the perimeter of the building – providing a pleasant working environment with good natural lighting. In the central part of the newly built volume, there is a block of common and auxiliary spaces with a rest and dining area, a kitchen, a wardrobe, bathrooms, technical rooms, conversation and meeting rooms. A wide corridor leads around this block of common and auxiliary spaces, which forms a transit zone between them and the work spaces. In the rebuildable part of the building, a conference room and a block of toilets have been renovated. The rest and dining area of the part of the newly built part, as well as the meeting room of the rebuildable part, are connected directly to the inner courtyard, creating a well-equipped outdoor recreation space for everyone.