It is proposed to divide the construction into two main stages, for which several sub-stages are possible.
Until 2021. in the 1st stage, it is planned to develop a project and reconstruct the old building with an area of 2230 m², as well as to build a new 920 m² extension. In the 1st phase of the planned construction, a block of administrative premises, a block of natural science laboratories and a block of social science cabinets would be added to the extension.
Following 2021, in the 2nd stage, during the summer holidays, it is possible to reconstruct the new building as a primary school block and dismantling the canteen building, build a new extension instead with public common areas on the ground floor (multi-functional hall, library, dining room, wardrobe) and classrooms.